1 00:00:00,506 --> 00:00:23,556 [ Music ] 2 00:00:24,056 --> 00:00:27,846 The solar array wing we tested here today was the qualification 3 00:00:27,846 --> 00:00:31,386 model wing provided by Airbus Defence and Space, Netherlands. 4 00:00:31,796 --> 00:00:34,726 For this test, we just have one functional wing 5 00:00:35,126 --> 00:00:37,756 and it's the qualification model wing that went 6 00:00:37,826 --> 00:00:40,656 through more full qualification testing in Europe, 7 00:00:41,526 --> 00:00:43,446 and so this is the only functional wing we have 8 00:00:43,446 --> 00:00:44,656 on this test article. 9 00:00:44,956 --> 00:00:47,596 All the others are represented with mass simulators. 10 00:00:47,886 --> 00:00:50,926 When all four solar array wings are deployed tip to tip, 11 00:00:51,416 --> 00:00:56,046 they're sixty-four feet long and all four wings together generate 12 00:00:56,046 --> 00:00:57,446 around eleven kilowatts of power. 13 00:00:58,186 --> 00:00:59,646 For this test, there were several things 14 00:00:59,646 --> 00:01:00,336 that we looked at. 15 00:01:00,336 --> 00:01:03,336 This was the first time we used those thermal knives 16 00:01:03,776 --> 00:01:05,556 to start the deployment sequence 17 00:01:06,036 --> 00:01:08,746 and that allowed-cut some tethers 18 00:01:09,156 --> 00:01:12,166 that then allowed the solar array to deploy. 19 00:01:12,476 --> 00:01:15,096 We wanted to test the locking mechanisms to ensure 20 00:01:15,096 --> 00:01:18,636 that it locked properly in space because anything 21 00:01:18,666 --> 00:01:22,356 that could possibly go wrong, we wanted to see test down here 22 00:01:22,796 --> 00:01:25,386 so that we can ensure a successful flight 23 00:01:25,386 --> 00:01:26,776 and deployment. 24 00:01:27,526 --> 00:01:28,616 After the test today, 25 00:01:28,616 --> 00:01:30,656 we're going to re-stow the solar array wing. 26 00:01:30,656 --> 00:01:33,246 We're going to take the test article to the vertical, 27 00:01:33,246 --> 00:01:36,446 and then we're going to install a crew module mass simulator 28 00:01:36,886 --> 00:01:39,256 and the spacecraft adapter jettison bolt bearings, 29 00:01:39,956 --> 00:01:43,586 and that will complete the test article configuration 30 00:01:43,686 --> 00:01:46,976 for the next test, which is an acoustic test. 31 00:01:47,056 --> 00:01:48,656 After we go through all the tests that we're going 32 00:01:48,816 --> 00:01:50,476 to do here, we're going to do some acoustic tests 33 00:01:50,896 --> 00:01:53,436 to simulate the launch environment, vibration tests 34 00:01:53,436 --> 00:01:56,096 and some pyro tests, and at the conclusion 35 00:01:56,096 --> 00:01:58,006 of those we'll do another solar array test, 36 00:01:58,006 --> 00:01:59,456 and we'll determine whether